Battersea Power Station

Working under the direction of Balfour Beatty PLC, our Senior Acoustic Engineer Andrew Wright conducted crucial acoustic tests on the multi-billion pound site in London.

  • Vibration regression analysis
  • Noise profiling 
  • Pile testing (pre-cast, drilled, sheet and vibro).